A Family of Brands
unbeatablesale
boncui
playingkitchen
funtoymall
halloween mall
petshopusa
toolschest
weddingandpartymall
allgourmetfood
collectablesmall
gadgetsandpresents
housedecormall
procurnow
stylish apparel
technooutlet
comfortmarket
greatermedical
jewelryshope
lighting-decor
travelbag
rewardsmalls
sportsrecreationmall

Apex Lufkin 182-HC253N 0.37 in. x 50 ft. Tape Long Leader

MSRP: $94.78
$68.48
Availability: In stock
SKU: ORSNO253821

Sorry - this product is no longer available

Features
  • Across the board, our tools stand for quality, innovation and value
  • Our portfolio of over 30 innovative brands includes many category
Specifications
  • Color: Black
  • Case Material: Vinyl-Covered Steel
  • Blade Material: Steel
  • Blade Length: 50 ft.
  • End Type: Folding End-Hook Ring
  • Reel Type: Closed Reel
  • Weight: 13 lbs
Products specifications
Attribute name Attribute value
MPN 182-HC253N
Color Black
Size 0.37 in. x 50 ft.